©PROPOSAL INPUT FORM
|
Customer: |
Contact: |
|
Address: |
Phone: |
|
City, ST, Zip: |
Fax: |
|
Equipment Location: |
Email: |
|
Type, Size & Mfr. of Equipment: |
|
ROI: ____Yes ____No Use one input form for each system to be quoted.
|
Number
|
Size
|
Type
of Line (See below*)
|
| Cooling System | Return to tower; Supply(s) to Condenser/Heat Exchanger(s); Make Up Line(s) |
| Boiler System | Horsepower; Supply Line to Boiler; Make Up Line; Condensate Return Line(s) |
| Supply to Air Washer; Return to Chiller; Make Up at Sump | |
| Also | Supply Lines to any additional equipment i.e., Air Compressors; Mold Machines, By-Pass, etc |
Cooling System ROI Input Information
Complete
information is necessary for ROI.
|
Yearly Operating Hours: |
System Tonnage: |
Number |
HP |
|
|
Water Cost per 1000 gal.: |
Cooling water circulating pump(s) rating |
|||
|
Sewer Cost per 1000 gal.: |
||||
|
Power Cost per KWH: |
Tower Fan Motor(s) rating |
|||
|
Annual Chemical Costs: |
Chill water pump(s) rating |